Washington State Solar Production Incentive

Washington State Department of Revenue

Available Solar & Renewable

About This Program

The Grant Map catalogs Washington State Solar Production Incentive in its Lacey, WA research directory. The record carries audience tags for homeowners; those tags do not establish eligibility or current service coverage.

Washington State incentive program for residential solar photovoltaic systems. Participants receive annual payments based on electricity production for up to 8 years. New applications accepted for systems installed before June 30, 2029.

Annual production incentive paid for up to 8 years based on system output

The cited program-specific URL responded on 2026-07-21; confirm current terms.

Record set last reviewed 2026-06-09. How we verify our data.

Other published resources for Lacey, WA, are listed below. Review each separately and ask the administrators whether they can coordinate funding for the same work:

Key Details

  • Annual payments for solar electricity production
  • Up to $5,000 per year for 8 years
  • Applies to residential solar PV systems
  • Must apply within 90 days of system activation
  • Available through June 2029

How to Apply

Review possible next steps Open Cited Source Track this program

Program phone: (360) 705-6705

Some programs require contractor estimates, licenses, or inspections. A cited link may be general, so confirm the current rules with the administrator before hiring; a directory match does not guarantee contractor eligibility or funding.

You may need a contractor or estimate

Some programs for this project type ask for a license, inspection, or written estimate. Confirm the rule before contacting a contractor in Lacey.

Get matched with a contractor

Each administrator sets its contractor rules. Confirm exact requirements directly; the cited URL may be a general agency page.

Your application paperwork

Documents you will likely need

  • Proof you own and live in the home (deed, recent mortgage statement, or property tax bill).
  • A government-issued photo ID for every owner on title.
  • A written estimate from a licensed contractor for the work (many programs require this to apply).
  • A recent utility bill for the home (energy and weatherization programs use it to confirm service and usage).
  • Photos of the problem area or the work to be done.
  • The program's own application form, completed (use the official link or phone number on this page).

Requirements vary by program and locality. Confirm the exact rules and application route with the administrator. We can help you prepare your paperwork, but you submit it yourself.

Deadline: Applications accepted for systems installed through June 30, 2029

Questions about this program?

Email us at no charge. Messages are reviewed manually, but a response time is not guaranteed.

Email us about this program
Report a problem with this listing

Frequently asked questions

What amount is listed for Washington State Solar Production Incentive in Lacey, WA?

The Grant Map record states: Up to $5,000 annual incentive. Confirm the current amount and eligible costs with the administrator.

What audience tags are recorded for Washington State Solar Production Incentive in Lacey?

The directory record carries audience tags for homeowners. It also carries a no-income-limit tag. These tags do not establish eligibility; confirm the complete current rules with the administrator.

How do I apply for Washington State Solar Production Incentive in Lacey, WA?

Confirm the application route directly with Washington State Department of Revenue; use the cited source on this page as a starting point or call (360) 705-6705. Confirm any fee or cost with the administrator. Deadline: Applications accepted for systems installed through June 30, 2029.

Need a Contractor for This Project?

Browse local listings or request an introduction. The Grant Map does not guarantee licensing, program experience, work quality, or funding.

Find More Programs in Lacey, WA

This is one of several kinds of assistance that may be available. Review other programs separately and confirm whether their administrators allow coordination for the same work.

See All Programs